Cape Town · SSEG registration (no export)

Solar on your roof.
The City needs to know.

Even if you never feed power back to the grid, Cape Town requires your system to be registered with the municipality — e-Services, ECSA sign-off, and compliance documentation. There is no AMI meter to buy and no metering quotation, so nothing about how you buy electricity changes. We handle the application so you are legal, insurable, and ready if you sell.

6–12 wks
Typical approval
R3,000
Our fee, in two parts
ECSA
Sign-off included
No meter
Nothing new installed
Register with the City
We'll review your system and confirm what's needed for non-export registration. No obligation.

Noted. We'll be in touch.

Expect a message within 48 hours to discuss your system and next steps. Until then — your roof keeps working.

We use these details only to assess your system and reply to this enquiry. See our privacy notice.

No payment required  ·  Response within 48 hours

Our Process

You will not be sourcing an engineer.

The City requires professional engineer sign-off on a grid-tied system whether it exports or not — homeowners can't shortcut that. We hold it, and we hold the file until the approval letter arrives.

One short form: your name, your number and your suburb. No documents to dig out, no breaker sizes to check. We confirm what your registration will involve and reply within 48 hours.

We come to you. We photograph the installation to the standard the engineer needs — inverter markings, DB board, isolators, earthing, array — and put the ECSA-registered professional in place. Finding that engineer independently is where most homeowner attempts stall. You are not sourcing one, briefing one, or explaining your inverter to anyone.

Once the application is lodged the City begins writing to you directly as the account holder. Forward those to us and the City redirects to us from there. We handle the queries and the commissioning documents through to the approval letter and your compliance pack. With no export there is no meter to install and nothing to activate — approval is the finish line.

None of this is difficult on its own. It is long, particular, and easy to stall on once. That is the part we take. See the City process in full, and who does each part.

Start my registration

No payment now  ·  Response within 48 hours

The engagement

R3,000 — the engineer, the application, and the follow-through

Included in the fee

  • Eligibility and system validation — we confirm what the City requires for your installation before anything is submitted
  • Supply and system verification — breaker rating, phase configuration and how your property is supplied
  • On-site documentation visit — we come to the property and photograph the installation to the engineer's standard
  • Application preparation and submission — the full City SSEG submission, assembled and lodged as non-export
  • ECSA professional sign-off — coordinated with our contracted registered engineer
  • City correspondence and queries — we hold the file and answer, so you don't
  • Approval and compliance pack — the documented approval trail your insurer, your conveyancer and a future buyer will ask for

Costs that sit outside our fee

One cost can sit outside our fee on the non-export path, and it is not always there. The costs that complicate the export arithmetic do not apply here at all.

  • Remedial electrical work — where the installation needs correction before the City will approve it. Quoted by a registered contractor, not by us.

There is no AMI meter to buy, no metering quotation, and no street-boundary meter box or cabling. Those are export requirements. If you are on prepaid, nothing about your meter changes. If you are on a credit meter, the City exchanges it for a prepaid meter at its own cost. Where remedial work is needed we establish it and price it before the balance falls due, and if the total puts you somewhere you would rather not go, we will tell you so.

R1,500 on bookingR1,500 once the City approves your registrationBalance is only due if your application succeeds

How you pay

Each R1,500 is invoiced when it falls due, and settled by Visa or Mastercard card, or by Instant EFT straight from your bank. The first review is free — nothing is payable until you book.

The numbers

What it costs, and what it doesn't

WattButler — site inspection and applicationR1,500
WattButler — balance on City approvalR1,500
City AMI bidirectional meterNot required
AMI administration fee (monthly)Not applicable
Credit-to-prepaid meter exchange, where applicableAt the City's cost

Once-off cost: R3,000. Nothing recurs, and nothing is added to your monthly account.

The R6,651.90 AMI meter that makes export possible is the largest single cost on the export path, and it does not arise here. Nothing new is installed at your metering position. If you are on prepaid you carry on buying tokens exactly as you do now; if you are on a credit meter the City exchanges it for a prepaid meter at its own cost. You also stay on your existing tariff — non-export registration does not move you onto Home User.

The one variable is remedial electrical work, where an installation needs correction before the City will approve it. Where that applies, we establish it and price it before you pay the balance.

The R1,500 balance falls due only once the City approves your registration. If a rejection is within our control — documentation, submission, or a compliance issue our screening should have caught — it is never invoiced, and refunded if you have already paid it. The first R1,500 has paid the site visit and the ECSA professional, who is paid for the assessment and not for the outcome. Property-specific requirements and the City's own approval decisions sit outside that.

Questions

What clients typically ask

Yes. Cape Town still requires SSEG registration for grid-tied solar even when you do not export. A Certificate of Compliance alone is not enough. The City's process needs e-Services submission and ECSA professional sign-off — whether or not you feed power back to the grid.
A Certificate of Compliance is not the same as City SSEG approval. If you hold a commissioning approval letter from the City, the process is complete and there is nothing for us to do. If you don't, we can check your status before you pay anything.
Our fee is R3,000, split into two payments of R1,500. The first R1,500 books your site inspection — we visit, document the installation, and engage the ECSA-registered professional. The engineer is paid for the assessment, not for the outcome, so that first payment stands either way. The remaining R1,500 is due only once the City approves your registration. Each invoice can be settled by Visa or Mastercard card, or by Instant EFT from your bank. The review on this page is free and does not commit you to proceed.
Usually not. Non-export registration needs no AMI meter, no metering quotation and no street-boundary metering work, so the costs that dominate an export application are simply absent. The one exception is remedial electrical work, where an installation has to be corrected before the City will approve it — that is quoted by a registered contractor. We surface it as early as we can. Every conditional cost is set out in full here.
No. Without export there is no AMI meter and no move onto a Home User SSEG account, so you carry on buying tokens exactly as you do now and stay on your existing tariff.

If you are on a credit meter, the City replaces it with a prepaid meter as part of the process, at its own cost. Either way, registration changes your paperwork rather than your bill.
Typically 6 to 12 weeks from a complete, correctly submitted application, though City timelines and property-specific work can extend it. Most delays stem from incomplete applications at submission — which is precisely what we prevent. We track the file and respond to queries; we do not promise a date controlled by the City.
Mostly not. We come to the property and photograph the installation ourselves, so the engineer's evidence does not depend on your installer being responsive. The one thing we need from you is your inverter and panel spec sheets, and those are usually already in your installation handover pack — we approach your installer only if something is missing, and we handle that communication directly.
Yes, but it is a second application rather than a switch you can flip. Exporting adds the requirements this path avoids: an approved inverter, a City metering quotation, the AMI bidirectional meter, and the move onto a Home User SSEG account. If export looks like it might pay for your property, say so and we will model it before you register either way. See export registration.
Most rejections are correctable. Missing documents and technical mismatches usually are, and we explain the reason and what remediation requires.

If the rejection was caused by something within our control — documentation, submission, or a compliance issue our screening should have caught — you are not invoiced for the R1,500 balance, and we refund it if you have already paid.

If it was caused by the property itself, we tell you plainly what the City requires and what it is likely to cost. The first R1,500 covers the site inspection and the ECSA-registered professional, who is paid for the assessment whether or not the application succeeds.
Buyers and conveyancers increasingly ask for proof of municipal solar registration. Completing the City process gives you a documented approval trail and reduces the risk of registration paperwork delaying a future sale.
Cape Town's e-Services portal makes the solar registration process genuinely navigable. Other municipalities — Tshwane, eThekwini, Johannesburg — operate inconsistently and many lack a functioning sub-50kW process entirely. We begin where we can deliver reliably, and expand deliberately.
No. WattButler is an independent service by Acre Energy (Pty) Ltd. We prepare and manage applications through the City's official process and coordinate a contracted ECSA professional, but the City makes the approval decisions.